Is there a hob there now?
Gas Hob Installation South Africa is a kitchen job as much as a gas one, because the hob drops into a counter that has to be cut to the manufacturer's own template and the pipe has to arrive inside a cabinet without running where a drawer will hit it. Replacing an electric hob with gas also means an unused point behind it and a new supply from a bottle or a piped line. Say what is there now, and compare priced quotations.
Super easy & fast
- See the cutting, the pipework and the connection priced separately, so you never pay too much.
- Send the same kitchen to several gas installers, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that the cutout is done to the hob template.
Say what is in the counter now and get hob quotes.
Get the Best QuoteGas Hob Installation Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Hob fitted into an existing cutout and piped | R1,800 - R4,500 |
| Cutting a new opening, laminate counter | R600 - R1,800 |
| Cutting a new opening, granite or stone | R1,500 - R4,500 |
| Gas hob supplied and fitted, four burner | R4,500 - R12,000 |
| Gas hob supplied and fitted, five burner | R6,500 - R18,000 |
| Pipe run from an outside bottle, per metre | R350 - R900 |
| Cut and vent a cabinet for a bottle | R600 - R2,200 |
| Isolating an old electric hob point | R450 - R1,500 |
| Certificate of conformity | R650 - R1,800 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African gas installation rates. They are not our prices or quotations, and no provider is bound by them. Gas work is quoted on the APPLIANCE and on the LENGTH AND ROUTE of the gas pipe that feeds it, so confirm what each quotation includes, such as the site visit, the appliance itself, the pipe, fittings and regulator, the flue and where it terminates, the cylinders and their cage, the certificate of conformity, and whether taking an old unit away is in the figure.
What Decides the Price
- The counter material. Granite and engineered stone are cut by a specialist.
- Whether a cutout exists. An electric hob rarely leaves the right hole.
- Where the gas comes from. A bottle in the cabinet or a piped line from outside.
- Cabinet ventilation. A bottle in a cupboard needs proper low venting.
- The certificate. Included by some installers and charged by others.
Replacing an Electric Hob
- The hole is usually wrong. Different size, and stone cannot be made smaller.
- The point stays or goes. Isolated by an electrician, by agreement.
- An extractor may need moving. Gas puts more moisture and heat into the hood.
- Clearances change. Distance to a side wall matters more with a flame.
- The drawer below. Often loses depth to the hob body and the pipe.
What the Installer Checks
- The template. The manufacturer's cutout, not a measured guess.
- The pipe route. Clear of drawers, heat and anything that will be drilled.
- The regulator. Correct pressure for the hob, with an isolation valve.
- Ventilation. The room and the cabinet holding the bottle.
- A leak test. Every joint under pressure before the flame is lit.
Get a price for your own counter rather than a range.
Get the Best QuoteWhat Affects the Price
- The counter material. Stone cutting is a trade of its own and is priced as one.
- Whether the hole fits. The single biggest unknown on a replacement.
- Bottle inside or outside. Outside means pipe through a wall and a cabinet.
- How far the gas comes. Every metre is material and labour.
- The extractor above. Moving or upgrading it is a separate line.
- Whether the CoC is in it. Ask, because it is the easiest line to leave out.
What to Include in Your Request
- The address. Suburb and town, so you reach installers who work there.
- What is in the counter now. Electric hob, gas hob, or a blank top.
- What the counter is made of. Laminate, solid surface, granite or engineered stone.
- How many burners you want. Four and five burner hobs are different openings.
- Where the bottle would go. The cabinet below, or outside with pipe run in.
- Photos. The counter, the cabinet below and the wall behind.
Before You Appoint a Gas Installer
- Ask who cuts the counter. Them, a stone specialist, or you arrange it.
- Ask about the existing hole. And what happens if the new hob is smaller.
- Ask where the pipe will run. Drawers and a gas pipe compete for the same space.
- Ask about cabinet ventilation. A sealed cupboard with a bottle in it is the fault.
- Ask for the registration number. Only an authorised person may certify it.
- Ask who isolates the old point. An electrician, usually, and not always included.
Gas Hob Installation FAQs
How much does a gas hob installation cost in South Africa?
Fitting and piping a hob into an existing opening is commonly R1,800 to R4,500. Cutting a new opening adds R600 to R1,800 in laminate and R1,500 to R4,500 in granite or engineered stone. Supplied and fitted, a four burner hob usually lands between R4,500 and R12,000, with the certificate of conformity on top.
Can a gas hob go where an electric one was?
Usually, but the opening is rarely the same size. A larger gas hob can cover a smaller hole; a smaller one cannot fill a bigger one, and stone cannot be made smaller, so that is the case where a counter or an insert is needed. Measure the existing cutout before choosing the hob rather than after.
Where does the gas bottle go with a built in hob?
Either in the cabinet below, which has to be properly ventilated at low level, or outside with copper run in to an isolation valve under the counter. Outside is the better answer wherever there is a wall to pass through: it keeps the cabinet usable and takes the bottle out of the kitchen.
Do I need a certificate for a hob?
Yes. Any gas appliance installation needs a certificate of conformity from a registered, authorised person, and a hob is no exception. It is what an insurer will ask for after a kitchen fire and what a conveyancer will ask for at transfer, so confirm it is in the quoted price.
Does the extractor need to change?
Sometimes. A gas flame puts more heat and moisture into a hood than an element does, and a recirculating extractor that coped with electric can struggle. It is worth asking the installer to look at it while they are measuring, because moving or upgrading a hood is much easier before the hob goes in.
A hob is a counter job and a gas job at once, and Gas Geyser Hub is the quickest way to get both halves quoted together.
Related Services
Get the Best Quote, Fast
Client Reviews
Powered by leaderr

